Engineering and Human Settlement Sector
Mandates:
-
Prepare design, drawings and estimates for all the construction activities in the Dzongkhag.
-
Assist in the preparation of bidding documents, bid evaluation, execution, closure of the project and hand over to the respective sector.
-
Carry out the monitoring and supervision of the construction activities and ensure that the work is as per the drawings and specifications provided.
-
Scrutinize designs and drawings for the proposed activities.
-
Ensure timely and quality service delivery to the public.
-
Ensure timely supply of clean drinking water in the Dzongkhag.
-
Carry out all the major and minor maintenance work in the Dzongkhag.
-
Provide a technical backstopping to all the sectors and regional offices.
-
Review construction plans
-
To control and manage waste in the Dzongkhag
-
Provide a safe working environment to the workers at site.
-
Construction and maintenance of drinking and irrigation water supply.
-
Ensure that the construction works are carried out as per the Building Code of Bhutan and Bhutan Building Regulations.
-
Carry out the RWSS and farm road survey.
-
Issue occupancy certificates for the private buildings.
-
Issue municipal clearance certificates.
-
Verify the land boundary in close consultation with the land sector.